SECTION 05 — Evidence

Customer Case Studies


Analyst note

915 factories globally use CAM Assist in production. Measured programming time reductions of 50-70% across company sizes (3-person job shops to ASML-tier supply chains), verticals (aerospace, motorsport, defence, robotics, oil and gas), and geographies. This is not a technology demonstration. These are production deployments by factories that stake their revenue on the output. When a machine shop running defence contracts trusts AI-generated toolpaths on real metal, the product-market fit question is answered.

915
Factories using CAM Assist
60-80%
Typical programming time reduction
5
Countries represented

Across every published case study, three patterns repeat. First, programming time drops by 60-80%, with some shops reporting higher. Second, the product pays for itself on time savings alone, often within the first month. Third, it makes junior programmers productive faster, which matters when experienced machinists are retiring faster than new ones are entering the workforce. Customer mix ranges from 2-person shops (Dreams Machining, Auxilium) to operations running 10,000+ part numbers (Hamilton Company). See The Machinist Shortage.


SECTION 02 — Summary

At a Glance

Customer Result Impact
Dreams Machining $50K/yr saved 2 days/month recovered
MSP Manufacturing 1.5 hrs → 23 min 5x daily throughput
Avalanche Energy Hours → minutes ~3 months saved/year
Xeon NC 1 hr → 12 min Avoided a hire
Total Mfg Solutions 45 min → 5 min 80-90% reduction
Frerotech 60-95% faster Some parts perfect first time
Shenzhen Ter Hours → 30 min 70% time savings
Arcamed 75% automated Targeting 90-100%
FJH Group 70% faster quoting Can't manage without it

SECTION 03 — Industry Breadth

Industry Breadth

Aerospace & Defence
MSP, Align, Total Mfg, Dreams, Auxilium
Medical Devices
Arcamed, Hamilton
Nuclear Fusion
Avalanche Energy
Semiconductor
Frerotech (ASML supply chain)
Space
Dreams (Artemis), Auxilium
General Precision
Xeon NC, Maki, Bedford, Baltec, FJH

These case studies span the US (Florida, Indiana, Alabama, Nevada, Washington), UK, Netherlands, Lithuania, and China. 50 factories in China are using CAM Assist with zero local sales presence. The product is available in 13 languages.


SECTION 04 — Featured Case Studies

Featured Case Studies

Dreams Machining
Longwood, Florida — 2-person aerospace shop (SpaceX, Blue Origin, Lockheed, Boeing supply chain)
Aerospace & Defence
$50,000/year saved 2 days/month recovered
"At our shop rate, that's saving two days a month. That's $4,000 a month. That's a $50,000 savings to us in our pocket."
"As far as value, dollar spent, it's the best money spent. To have a programmer basically sitting there working for you, whatever we need, it's always there."
"Embrace the technology because honestly, if you don't, everybody's going to run right past you."
Watch video →
Bloomington, Indiana — Johnny Goode, President
Customer since July 2024
Aerospace & Defence
1.5-2 hrs → 23 min 5x throughput
"We had one skilled programmer take about 1.5-2 hours to program a part. With CAM Assist, it took 7 minutes to get 80% of the way there, and the programmer spent 15 minutes fine-tuning it. So, in 23 minutes, we did what used to take nearly two hours."
Johnny Goode, President
"It's increased the number of jobs they can program in a day by at least five times."
Johnny Goode
View case study →
Washington State — Anthony Stephenson, CNC Machinist/Programmer
Customer since September 2024
Nuclear Fusion
860 parts in 6 months ~3 months saved/year
"Something that would take me hours to program, I can do in minutes. I can click a button and five minutes later I have like 75-80% of the program."
Anthony Stephenson
"Shops that don't adopt this kind of tool will eventually disappear. There's no way to compete with a shop that does have it."
Anthony Stephenson
View case study →
Evan Hayes, Co-founder
Job Shop
1 hr → 12 min Avoided a hire
"What used to take an hour now takes just 12 minutes, and that's with better results. Hiring another programmer would have been a major expense. CAM Assist allowed us to achieve the same efficiency without the additional overhead or training."
Evan Hayes, Co-founder
View case study →

SECTION 05 — All Case Studies

All Case Studies

Reno, Nevada — Philip Linscheid, Director of Manufacturing
Precision Manufacturing
10,000 part numbers 5M+ parts/year · 10-20 new programs/week
"If a company does not adapt and adopt this technology, someone else will — and it will be difficult to defeat the competition without these amazing tools."
Philip Linscheid, Director of Manufacturing
View case study →
Tuscaloosa, Alabama — Daniel Smith, Manufacturing Engineer
Aerospace & Defence
Several hours cut per job Clear ROI
"The time savings alone mean CAM Assist has effectively paid for itself. Reduced programming hours, fewer errors, and improved machine utilization have delivered a clear return on investment."
Daniel Smith, Manufacturing Engineer
View case study →
Laporte, Indiana — Jeff Maki (Owner) & Austin Whitmer (Machine Shop Manager)
Multi-sector
70-80% auto-generated Hours → minutes
"The difference is incredible. It's like moving from caveman to spaceman. What used to take hours can now be done in minutes."
Jeff Maki, Owner
"I had questions at the beginning, but now I trust it 100%."
Austin Whitmer, Machine Shop Manager (14 years experience)
View case study →
Florida — Chris Battelene, Owner — 14 CNC machines, 14,000 sq ft
Aerospace & Defence
45-60 min → 5-10 min 80-90% reduction
"Previously it would take me about 45 minutes to an hour to program those parts by hand, but with CAM Assist I could pump out the programs in 5-10 minutes."
Chris Battelene
"The other huge benefit is that guys who don't have as much experience with programming can run a machine and make parts. It helps bridge that gap in the learning curve relatively quickly."
Chris Battelene
View case study →
Indianapolis, Indiana — Dominic Desalvo, CNC Programmer
Customer since August 2024
Medical Devices
75% automated Targeting 90-100%
"Since August we have seen a massive transformation of what CloudNC can do and how much more accurate and fast it is in just a few months."
Dominic Desalvo, CNC Programmer
View case study →
Shenzhen, China — Jia Yu, General Manager
Customer since April 2025
Robotics & Energy
70% time savings Hours → 30 min
"For a part like this, it takes several hours to program by manual work, but now we need only over 10 minutes with CAM Assist, and then it takes about 20 minutes for the manual check and adjustment, so the total time is just about 30 minutes. It saves 70% of the time."
Jia Yu, General Manager
View case study →
Kaunas, Lithuania — Marius Randakevičius, Programmer
Multi-sector
50% time savings Complex: 1 hr → 5-10 min
"Our enquiries are calculated much faster and more accurately, and that's where we win with this product."
Marius Randakevičius, Programmer
View case study →
Elsloo, Netherlands — Stefan van Bergen, Mechanical Engineer
ASML Supply Chain
60-95% time savings Some parts perfect first time
"For some parts, the program came out perfectly the first time. We didn't have to change a thing."
Stefan van Bergen
"We don't see it as a replacement for the programmer, but as a tool. Let the AI handle the repetitive work — surfacing, rough milling, drilling — so that the machinist can focus on the critical details."
Stefan van Bergen
View case study →
United Kingdom — Mark Hyde, Engineer
Customer since 2023 (earliest adopter)
Engineering Consultancy
70% faster quoting
"Would you be able to manage without CAM Assist now? Honestly, no."
Mark Hyde
View case study →
United Kingdom — Andy Soos, Director
Job Shop
No longer programs manually
"It's 100% different from anything I've used before, it's just opened up a whole new world really. CAM Assist has really helped our business grow."
Andy Soos, Director
View case study →
Peridot Corporation
Medical device component manufacturing — GibbsCAM user
Medical Devices
Same-day quoting Winning more bids
"Eventually everybody's going to use this, everybody's going to have it. Every business is going to figure out that why the hell are we paying this guy to sit there for three hours when he could be doing something else?"
Peridot Corporation
Huntsville, Alabama — Anna Carlstrom & Michael Oliver
Space
2-person shop Competing with larger businesses

Video case study. Providing components for Space Race 2.0 from Rocket City, Huntsville.

View case study →

All case studies published with customer consent. Full versions at cloudnc.com/case-studies.